Vertical merchandise planning with SAP BW-IP and HANA PAK
Introduction of system-supported merchandise planning
CUSTOMER PROFILE
Industry: Fashion Retail
Headquarters: Metzingen
REQUIREMENTS
- The starting point is a historically developed, highly heterogeneous system landscape with production and sales planning based on it.
- Systems used include SAP ERP, TXT (industry solution), SAP BW, in-house developments with ABAP and C, and a large number of Excel workbooks.
- The project aimed to implement integrated, automated vertical planning with SAP BW-IP.
OUR SERVICES
- Inventory in workshops with our customer and ISR
- Preparation of a feasibility analysis/rough concept and parallel ISR-side prototype implementation
- Design of an agile, iterative project approach based on the findings of the feasibility analysis
- Implementation of vertical merchandise planning with SAP BW-IP / HANA PAK
CLIENT VALUE
- End-to-end mapping of the merchandise planning process
- Greater transparency throughout the entire process
- Significant reduction in planning lead times
- Increased flexibility in planning changes (simulation/forecasting)
- Company-wide integrated and high-performance IT solution
TECHNOLOGIES
- SAP BW on HANA
- BW-IP
- HANA PAK
Interested in additional case studies?
Valgeir Saevarsson
Managing Consultant
SAP Information Management
Valgeir.Saevarsson@isr.de
+49 (0) 151 422 05 422